Fehily Timoney Logo
facebook_image.jpg
Useful Links
HomeNewsFT InternationalCorporate ProfileExpertiseJoint VenturesAwardsCareersContact

You are here: Home arrow Design & Build Services
 
Design & Build Services PDF Print E-mail

We have been working on Design and Build projects for over ten years both in the role of Clients Representative and Designer.

To service the National Roads Programme, we formed a joint venture company (Fehily Timoney Gifford) with the UK consultancy firm, Gifford in 1999 and have been working in that sector since. In 2002, formal agreement was also reached with the Danish consultancy Rambøll for collaboration on D&B and PPP type projects amongst others. Accordingly, a wide range of services are available to our D&B and PPP clients.

To serice the Water Services Investment Programme we have partnered with various civil and M&E contractors to design a number of water and wastewater schemes.

Our work experience in the D&B market is unsurpassed. In particular, the success of FTG at design and build contracts in the roads sector has resulted in major Irish contractors retaining FTG as design consultants. FTG currently acts as designer for a number of large design and build road projects in Ireland. These include N25 Youghal Bypass, N8 Cashel Bypass & N74 Link, M7 Heath Mayfield Motorway Project (Monasterevin Bypass), N11 Gorey to Arklow Link, N9 Phase 3 (Kilcullen to Carlow) and N9 Phase 4 (Knocktopher to Powerstown). 

Rambøll-FTG acted as the Clients Representative for the Arklow Bank Wind Farm. FTC also acted as the Clients Representative to the Port of Cork on the recently constructed ore handling facility.
This blend of experience has fostered a partnering approach within the company to the execution of these types of projects.

Services Provided

  • Road design
  • Bridge design
  • Civil and structural engineering
  • Temporary Design and Checking
  • Category 3 Checking

Representative Experience

Ascon Ltd: N25 Youghal Bypass.
Roadbridge Ltd: N8 Cashel Bypass, Bundoran/Ballyshannon Bypass, N11 Gorey to Arklow Link, N9 Phase 3 (Kilcullen to Carlow).
Roadbridge/Sisk JV Ltd: M7 Heath Mayfield Motorway, N9/N10 Phase 4 Knocktopher to Powerstown.
DirectRoute: N8 Fermoy Bypass Drainage Works and Toll Plazas, Category Three Checks Limerick Immersed Tube Tunnel and Temporary Works.
Tarmac Walls JV: Jack Lynch Tunnel, Cork (Temporary Steelworks).
Liffey Developments: Rail tunnel refurbishment at Cork (Kent) station.
Iarnrod Eireann: Coastal engineering (East Coast).
Airtricity: Arklow Bank Wind Farm (Clients Representative).
Port of Cork: Ore Handling Facility (Clients Representative).
Hegarty/Vinci JV: Carrigrennan Wastewater Treatment Plant (Designer)
SIAC/EPS: Meath (8 villages) Wastewater Treatment Plants.
Sorensen/EPS: Buttevant/Doneraile/Kilbriin Wastewater Treatment Plants
Jons Civil Engineering Company Ltd.: Clonmore Bridge

Contact Details

Cork
Oliver Tierney
T - 021 4964133
E - This e-mail address is being protected from spam bots, you need JavaScript enabled to view it

www.fehilytimoney.ie

 

 
Services and Expertise
Energy
Civil Infrastructure
Waste
Environment
Civil Infrastructure
Bridgeworks
Building
Civil Engineering
Client’s Representative for Roads Projects
Coastal Engineering
Design & Build Services
Drainage Infrastructure
Environmental Impact Assessment
Environmental Management Systems
Environmental Monitoring
Fire Certification
Geotechnical Engineering
Health and Safety
Hydrology
Noise
Rail
Pipeline Construction
Statutory Procedures
Visual Impact Assessment, ZVI Maps, Wireframe Views
Water Services - Water
Water Services - Wastewater
 © 2012 Fehily Timoney website design and hosting provided by www.jenerate.com